Our Active Projects
Take a look at our active jobs that showcase our expertise in multifamily construction

64 Danbury rd
Wilton, CT
64 Danbury Rd
Wilton, CT
64 Danbury rd
Wilton, CT

-
Eight residential buildings plus a 2,683 sq ft amenity building planned
-
93 apartments planned at 64 Danbury Road in Wilton, CT.
-
Complex site logistics managed across multiple buildings to support continuous progress and minimize downtime between phases

-
Eight residential buildings plus a 2,683 sq ft amenity building planned
-
93 apartments planned at 64 Danbury Road in Wilton, CT.
-
Complex site logistics managed across multiple buildings to support continuous progress and minimize downtime between phases
-
Eight residential buildings plus a 2,683 sq ft amenity building planned
-
93 apartments planned at 64 Danbury Road in Wilton, CT.
-
Complex site logistics managed across multiple buildings to support continuous progress and minimize downtime between phases


Hiawatha
HIAWATHA
Westport, CT
Westport, CT
Hiawatha
Westport, CT

-
157-unit multi-family residential development on a 220,000-square-foot property
-
Thoughtfully coordinated with the community and fully approved
-
Overlapping trade sequencing across buildings to expidite construction

-
157-unit multi-family residential development on a 220,000-square-foot property
-
Thoughtfully coordinated with the community and fully approved
-
Overlapping trade sequencing across buildings to expidite construction

-
157-unit multi-family residential development on a 220,000-square-foot property
-
Thoughtfully coordinated with the community and fully approved
-
Overlapping trade sequencing across buildings to expidite construction

15 Chestnut
Norwalk, CT
18 Chestnut
Norwalk, CT
15 Chestnut
Norwalk, CT

-
Ongoing site logistics planning to support simultaneous structural and framing progress
-
Continuous coordination with local authorities to maintain pedestrian flow and access
-
Tight staging logistics managed within a constrained downtown footprint
-
Ongoing site logistics planning to support simultaneous structural and framing progress
-
Continuous coordination with local authorities to maintain pedestrian flow and access
-
Tight staging logistics managed within a constrained downtown footprint

20 Fair St
New Haven, CT
20 Fair Street
New Haven, CT

-
Active multi-level residential construction within a dense urban infill site
-
Coordination between structural, framing, and MEP rough-in activities
-
Continuous management of site logistics to support multi-phase structural completion
-
Active multi-level residential construction within a dense urban infill site
-
Coordination between structural, framing, and MEP rough-in activities
-
Continuous management of site logistics to support multi-phase structural completion

Millpond
Norwalk, CT
Millpond
Norwalk, CT

Mixed-use development combining apartments with ground-level commercial space
Detailed coordination of historic-inspired architectural elements with modern systems
Coordinated installation of differing façade systems to support a cohesive design intent

-
Mixed-use development combining apartments with ground-level commercial space
-
Detailed coordination of historic-inspired architectural elements with modern systems
-
Coordinated installation of differing façade systems to support a cohesive design intent



